Additionally, to better help you with determining the angles of the stairs, you can also trace each step with the help of the scrap baseboards. If you used scrap baseboards to help you measure the angle of the stairs, transfer those findings onto the new baseboards.
Afterward, you can begin the exciting yet anxiety-inducing part of the process of cutting and sanding each baseboard. To make sure you cut and trim the baseboards at the right angles and measurements, you may require the help of a miter box.
This special tool allows you to make straight, accurate, and seamlessly clean cuts across pieces of wood. This will not only allow for a seamless fit, but it also gives the baseboards a clean, polished look. When you first begin the installation process of the baseboards around the stairs, you should first line the baseboards up and set them in place without nailing or gluing them.
This will allow you to make sure each baseboard fits correctly before permanently being nailed into place. Doing so will also prevent you from having to rip out a baseboard should it not fit correctly. Once the baseboards are all lined up evenly and everything looks perfect, you can begin nailing them down.
Oftentimes there will not be much for the nails to hold onto behind the baseboards and walls. Source: Installing Baseboard On Stairs.
After the glue has dried and the baseboards are fully set in place, brush off or wipe away any excess sawdust from the baseboards. If any nails remain visible after the baseboards have been permanently placed, you can easily cover them up with any type of caulking material.
Make sure that any caulking material you use matches the color of the baseboard. If needed, you can also mix any paint you used on the baseboards with the caulking material to get a color that matches closely. This design creates the effect of a square upper edge and a rounded corner below, both measuring at degree angles.
This term more or less refers to the design of the molding on the baseboards. Roll again in 1 hour. Roll any loose corners or edges of tile with a hand roller. If necessary, re-roll the entire installation with a lb.
Continue installing the remaining tile following steps 10 through Construction foot traffic is permissible only after plywood is placed over the rubber tile 5 hours after the second rolling. Rolling loads are not recommended for at least 72 hours. Stair Tread Procedure: Start at the bottom of the stairway, dry fitting the first riser. Dry fit the first tread, making certain that the tread fits tightly against the nose of the step.
Continue dry fitting the treads and risers until the entire flight of stairs is completed. Rubber Stair Treads are pre-sanded on the back to ensure good adhesion. If you detect a void in sanding on the back of the tread or riser, roughen it with coarse sandpaper or a wire brush. When bonding the nosing of a tread to the face of a riser, roughen the riser at the overlapped area with coarse sandpaper to ensure a good bond. Remove the dry-fit lower 6 or 7 Stair Treads and Risers.
Clean off the back of the Stair Tread using a clean, white cloth dampened with Denatured Alcohol. This will remove any mold release that may be on the back of the tread. Carefully follow warnings on container of the Solvent-Based Contact Adhesive. Set the bottom Stair Tread in place, beginning at the nosing.
Push back as firmly and as tightly as possible while holding up the rear portion of the tread. After the nosing is completely fit into place, push the rest of the tread down firmly onto the step. Roll with a hand roller. Continue removing dry-fit Stair Treads, applying solvent-based contact adhesive, setting the treads into the solvent-based contact adhesive and risers using S Adhesive in place and rolling. Work from the bottom riser and tread combination to the top until the entire flight of stairs is complete.
Pedestrian and construction traffic is not recommended for at least 12 hours after installation. There is also considerable added labor involved. Most contractors use some type of fascia to finish the edge of the deck and hide the underneath support joists. Many brands of decking actually offer fascia that will match the deck boards. However, if you are looking for a nice contrast in your deck design, you may want to opt for a fascia of cellular PVC.
Low maintenance cellular PVC is available in board and sheets and comes in smooth or textured finishes. Cellular PVC products come in white but can be painted, if desired. Here is a nice example of how you can install skirting, fascia and an access door under your deck. Install a nailer board between support posts to attach the bottom side of the skirting or install 2x4 vertical framing flush on the outside of the frame. Use a piece of scrap material to space your skirt boards.
Next, fasten each skirt board to the top and bottom of the skirt frame. Since the moulding is so light, you can just tape it right to the wall. Then go back with your brad nailer, and secure with small brads every inches. If any of the nails stick out, carefully set them with a nail setting tool. Then use wood filler to fill in the nail holes. Tape off a line above the moulding. Then prime and paint the moulding along with the wall below the moulding.
Once everything is painted the same color, if will give the effect of being a solid piece of solid wood trim.
0コメント